TheocBase/TheocBase
-
Update a Talk
Update a Talk
Päivitä teema -
If the outline or the title of a talk has been updated:
If the outline or the title of a talk has been updated:
Jos jäsennys tai esitelmän teema on päivitetty: -
If the title of the talk has been changed, doubleclick the <strong>Theme</strong> field of the updated talk, and enter the new title.
If the title of the talk has been changed, doubleclick the
<strong>
Theme</strong>
field of the updated talk, and enter the new title.Jos esitelmän teema on päivitetty, kaksoisklikkaa<strong>
Teema</strong>
-kenttää ja syötä uusi teema. -
You find the revision date at the end of the ouline, e.g. "No. 1-E <strong>9/15</strong>".
You find the revision date at the end of the ouline, e.g. "No. 1-E
<strong>
9/15</strong>
".Muokkauspäivämäärä löytyy jäsennyksen lopusta, esim. "Nro 1<strong>
9/15</strong>
". -
Add a New Talk and Replace a Discontinued Talk
Add a New Talk and Replace a Discontinued Talk
Lisää uusi teema ja korvaa lopetettu teema -
When a new talk is added it is possible to replace a discontinued talk automatically.
When a new talk is added it is possible to replace a discontinued talk automatically.
Kun uusi teema lisätään, on mahdollista korvata lopetettu teema automaattisesti. -
Caution:
Caution:
Varoitus: -
Don't follow these steps if it is just an update, e.g. revised outline, changes in the title but the same theme.
Don't follow these steps if it is just an update, e.g. revised outline, changes in the title but the same theme.
-
Click on the <img src="../images/add_24x24.png" alt="" width="20" height="20" /> button.
Click on the
<img src="../images/add_24x24.png" alt="" width="20" height="20" />
button.Klikkaa<img src="../images/add_24x24.png" alt="" width="20" height="20" />
painiketta. -
Enter the number and theme of the new talk in the <strong>Wizard</strong> dialog and click on the <strong>Next></strong> button.
Enter the number and theme of the new talk in the
<strong>
Wizard</strong>
dialog and click on the<strong>
Next></strong>
button. -
Select the language of the outline in the <strong>Import subjects</strong> dialog and push the <strong>OK</strong> button.
Select the language of the outline in the
<strong>
Import subjects</strong>
dialog and push the<strong>
OK</strong>
button. -
Click the <strong>Save to database</strong> button in order to save the changes.
Click the
<strong>
Save to database</strong>
button in order to save the changes.Klikkaa<strong>
Tallenna tietokantaan</strong>
painiketta tallentaaksesi muutokset. -
If the previous talk has not been discontinued yet, a dialog with the message to do so will appear. Hit the <strong>OK</strong> button to discontinue the previous talk and add the new one.
If the previous talk has not been discontinued yet, a dialog with the message to do so will appear. Hit the
<strong>
OK</strong>
button to discontinue the previous talk and add the new one. -
Doubleclick the <strong>Revision</strong> field of the new talk in the <strong>Public Talks</strong> list and enter the date of the update.
Doubleclick the
<strong>
Revision</strong>
field of the new talk in the<strong>
Public Talks</strong>
list and enter the date of the update. -
Remove a Discontinued Talk
Remove a Discontinued Talk
Poista lopetettu teema -
Open the <strong>Add talks</strong> page in the <strong>Public Talks Settings</strong>.
Open the
<strong>
Add talks</strong>
page in the<strong>
Public Talks Settings</strong>
.Avaa<strong>
Lisää esitelmiä</strong>
sivu<strong>
esitelmien asetuksissa</strong>
. -
Uncheck the <strong>Hide discontinued</strong> check box in order to enable editing of discontinued talks. Now the columns <strong>Released on</strong> and <strong>Discontinued on</strong> are visible as well.
Uncheck the
<strong>
Hide discontinued</strong>
check box in order to enable editing of discontinued talks. Now the columns<strong>
Released on</strong>
and<strong>
Discontinued on</strong>
are visible as well. -
Doubleclick the <strong>Discontinued on</strong> field and enter the date of the removal.
Doubleclick the
<strong>
Discontinued on</strong>
field and enter the date of the removal. -
If a speaker with this talk is scheduled, a message appears, that scheduled talks with this outline will be moved to the <strong>To Do List</strong>. Click the <strong>OK</strong> button.
If a speaker with this talk is scheduled, a message appears, that scheduled talks with this outline will be moved to the
<strong>
To Do List</strong>
. Click the<strong>
OK</strong>
button. -
Doubleclick the <strong>Revision</strong> field and enter the date of the update.
Doubleclick the
<strong>
Revision</strong>
field and enter the date of the update.