TheocBase/TheocBase
-
You find the revision date at the end of the ouline, e.g. "No. 1-E <strong>9/15</strong>".
You find the revision date at the end of the ouline, e.g. "No. 1-E
<strong>
9/15</strong>
".La date de révision se trouve à la fin du plan, par exemple "N° 1-F<strong>
9/15</strong>
". -
Add a New Talk and Replace a Discontinued Talk
Add a New Talk and Replace a Discontinued Talk
Ajouter un nouveau discours et remplacer l'obsolète. -
When a new talk is added it is possible to replace a discontinued talk automatically.
When a new talk is added it is possible to replace a discontinued talk automatically.
Lorsqu'un nouveau discours est ajouté, il est possible de remplacer automatiquement un discours obsolète. -
Caution:
Caution:
Attention : -
Don't follow these steps if it is just an update, e.g. revised outline, changes in the title but the same theme.
Don't follow these steps if it is just an update, e.g. revised outline, changes in the title but the same theme.
Ne suis pas ces étapes s'il s'agit simplement d'une mise à jour, par exemple, d'un plan révisé, des changements dans le titre mais ayant le même thème. -
Click on the <img src="../images/add_24x24.png" alt="" width="20" height="20" /> button.
Click on the
<img src="../images/add_24x24.png" alt="" width="20" height="20" />
button.Clique sur le bouton<img src="../images/add_24x24.png" alt="" width="20" height="20" />
. -
Enter the number and theme of the new talk in the <strong>Wizard</strong> dialog and click on the <strong>Next></strong> button.
Enter the number and theme of the new talk in the
<strong>
Wizard</strong>
dialog and click on the<strong>
Next></strong>
button.Écris le numéro et le thème du nouveau discours dans la fenêtre<strong>
Assistant</strong>
et clique sur le bouton<strong>
Suivant ></strong>
. -
Select the language of the outline in the <strong>Import subjects</strong> dialog and push the <strong>OK</strong> button.
Select the language of the outline in the
<strong>
Import subjects</strong>
dialog and push the<strong>
OK</strong>
button.Sélectionne la langue du plan dans la boîte de dialogue<strong>
Importer des thèmes</strong>
et appuie sur le bouton<strong>
OK</strong>
. -
Click the <strong>Save to database</strong> button in order to save the changes.
Click the
<strong>
Save to database</strong>
button in order to save the changes.Clique sur le bouton<strong>
Enregistrer dans la base de données</strong>
pour enregistrer les modifications. -
If the previous talk has not been discontinued yet, a dialog with the message to do so will appear. Hit the <strong>OK</strong> button to discontinue the previous talk and add the new one.
If the previous talk has not been discontinued yet, a dialog with the message to do so will appear. Hit the
<strong>
OK</strong>
button to discontinue the previous talk and add the new one.Si le précédent plan n'a pas encore été arrêté, une boîte de dialogue s'affiche avec le message à cet effet. Appuie sur le bouton<strong>
OK</strong>
pour supprimer le précédent plan et ajoute le nouveau. -
Doubleclick the <strong>Revision</strong> field of the new talk in the <strong>Public Talks</strong> list and enter the date of the update.
Doubleclick the
<strong>
Revision</strong>
field of the new talk in the<strong>
Public Talks</strong>
list and enter the date of the update.Double-clique sur le champ<strong>
Révision</strong>
du nouveau discours dans la liste<strong>
Discours Publics</strong>
et entre la date de la mise à jour. -
Remove a Discontinued Talk
Remove a Discontinued Talk
Supprimer un discours arrêté -
Open the <strong>Add talks</strong> page in the <strong>Public Talks Settings</strong>.
Open the
<strong>
Add talks</strong>
page in the<strong>
Public Talks Settings</strong>
.Va sur l'onglet<strong>
Gestion des discours publics</strong>
dans les<strong>
Paramètres des discours publics</strong>
. -
Uncheck the <strong>Hide discontinued</strong> check box in order to enable editing of discontinued talks. Now the columns <strong>Released on</strong> and <strong>Discontinued on</strong> are visible as well.
Uncheck the
<strong>
Hide discontinued</strong>
check box in order to enable editing of discontinued talks. Now the columns<strong>
Released on</strong>
and<strong>
Discontinued on</strong>
are visible as well.Décoche<strong>
Masquer les arrêtés</strong>
pour permettre l'édition des discours obsolètes. Maintenant, les colonnes<strong>
Libéré le</strong>
et<strong>
Arrêté le</strong>
sont également visibles. -
Doubleclick the <strong>Discontinued on</strong> field and enter the date of the removal.
Doubleclick the
<strong>
Discontinued on</strong>
field and enter the date of the removal.Double-clique sur le bouton<strong>
Arrêté le</strong>
et saisis la date de la suppression. -
If a speaker with this talk is scheduled, a message appears, that scheduled talks with this outline will be moved to the <strong>To Do List</strong>. Click the <strong>OK</strong> button.
If a speaker with this talk is scheduled, a message appears, that scheduled talks with this outline will be moved to the
<strong>
To Do List</strong>
. Click the<strong>
OK</strong>
button.Si un orateur est programmé avec ce discours, un message apparaîtra, indiquant que les discours programmés avec ce plan seront déplacés vers le menu<strong>
Liste A Faire</strong>
. Clique sur le bouton<strong>
OK</strong>
. -
Doubleclick the <strong>Revision</strong> field and enter the date of the update.
Doubleclick the
<strong>
Revision</strong>
field and enter the date of the update.Double-clique sur le champ<strong>
Révision</strong>
et entre la date de la mise à jour. -
Enter the public talks according to the instructions in the dialog.
Enter the public talks according to the instructions in the dialog.
Écris les discours publics en suivant les instructions de la boîte de dialogue. -
Tip:
Tip:
Astuce : -
After pressing the <img src="../images/add_24x24.png" alt="" /> button, the <strong>Wizard</strong> dialog opens.
After pressing the
<img src="../images/add_24x24.png" alt="" />
button, the<strong>
Wizard</strong>
dialog opens.Après avoir cliqué sur le bouton<img src="../images/add_24x24.png" alt="" />
, la boite de dialogue<strong>
Assistant</strong>
s'ouvre.