TheocBase/Test
-
The fields are separated with a tab character and multiple talks can be entered, separated with a comma.
The fields are separated with a tab character and multiple talks can be entered, separated with a comma.
-
Select in which order you entered the names (last name first name vs first name last name).
Select in which order you entered the names (last name first name vs first name last name).
-
When satisfied with the list, press the <strong>Save to Database</strong> button.
When satisfied with the list, press the
<strong>
Save to Database</strong>
button. -
Revised Public Talk Outlines
Revised Public Talk Outlines
-
In order to keep track of changing titles, outlines or complete replacements of talks it is possible to set the corresponding dates of their releasing and discontinuing as well as their current revision date. When a discontinued talk is replaced by another, it is neccessary to set the discontinued date [1] of the old talk and the release date [2] of the new talk, because these dates determine which of these talks should be displayed at a given time:
In order to keep track of changing titles, outlines or complete replacements of talks it is possible to set the corresponding dates of their releasing and discontinuing as well as their current revision date. When a discontinued talk is replaced by another, it is neccessary to set the discontinued date [1] of the old talk and the release date [2] of the new talk, because these dates determine which of these talks should be displayed at a given time:
-
Revised talk outlines
Revised talk outlines
-
Update a Talk
Update a Talk
-
If the outline or the title of a talk has been updated:
If the outline or the title of a talk has been updated:
-
Open the <strong>Add subjects</strong> page in the <strong>Public Talks Settings</strong>.
Open the
<strong>
Add subjects</strong>
page in the<strong>
Public Talks Settings</strong>
. -
If the title of the talk has been changed, doubleclick the <strong>Theme</strong> field of the updated talk, and enter the new title.
If the title of the talk has been changed, doubleclick the
<strong>
Theme</strong>
field of the updated talk, and enter the new title. -
Doubleclick the <strong>Revision</strong> field and enter the date of the update.
Doubleclick the
<strong>
Revision</strong>
field and enter the date of the update. -
You find the revision date at the end of the ouline, e.g. "No. 1-E <strong>9/15</strong>".
You find the revision date at the end of the ouline, e.g. "No. 1-E
<strong>
9/15</strong>
". -
Add a New Talk and Replace a Discontinued Talk
Add a New Talk and Replace a Discontinued Talk
-
When a new talk is added it is possible to replace a discontinued talk automatically.
When a new talk is added it is possible to replace a discontinued talk automatically.
-
Caution:
Caution:
-
Don't follow these steps if it is just an update, e.g. revised outline, changes in the title but the same theme.
Don't follow these steps if it is just an update, e.g. revised outline, changes in the title but the same theme.
-
Open the <strong>Add talks</strong> page in the <strong>Public Talks Settings</strong>.
Open the
<strong>
Add talks</strong>
page in the<strong>
Public Talks Settings</strong>
. -
Click on the <img src="../images/add_24x24.png" alt="" width="20" height="20" /> button.
Click on the
<img src="../images/add_24x24.png" alt="" width="20" height="20" />
button. -
Enter the number and theme of the new talk in the <strong>Wizard</strong> dialog and click on the <strong>Next></strong> button.
Enter the number and theme of the new talk in the
<strong>
Wizard</strong>
dialog and click on the<strong>
Next></strong>
button. -
Select the language of the outline in the <strong>Import subjects</strong> dialog and push the <strong>OK</strong> button.
Select the language of the outline in the
<strong>
Import subjects</strong>
dialog and push the<strong>
OK</strong>
button.