gTrax/gTrax Translation
-
Load Saved Report
Load Saved Report
gespeicherten Report laden -
Save Report
Save Report
Report speichern -
Include Archived
Include Archived
Archivierte Einheiten inkludieren -
Billable
Billable
abrechenbar -
Flexible Budget (Time and Materials)
Flexible Budget (Time and Materials)
flexibles Budget (Zeit und Aufwand) -
Fixed Budget (Fixed Bid)
Fixed Budget (Fixed Bid)
festes Budget (gedeckelt) -
No Budget (Unlimited)
No Budget (Unlimited)
kein Budget (ohne Limit) -
Start Timer
Start Timer
Start Erfassung -
Export to Google Docs
Export to Google Docs
zu Google Docs exportieren -
Description: Number of billable hours logged against a project vs. non-billable
0=htmlElement1Begin (Example: ), 1=htmlElement1End (Example: ), 2=htmlElement2Begin (Example: ), 3=htmlElement2End (Example: ){0}0{1} of those hours are billable and {2}0{3} hours are non-billable.{0}0{1} of those hours are billable and {2}0{3} hours are non-billable.
{0}0{1} dieser Stunden sind abrechenbar und {2}0{3} Stunden sind nicht abrechenbar. -
Notifications
Notifications
Benachrichtigungen -
Enable email notifications?
Enable email notifications?
Email-Benachrichtigungen zulassen? -
gTrax can send project members notification emails when a project is approaching or passes its assigned budget.
gTrax can send project members notification emails when a project is approaching or passes its assigned budget.
gTrax kann Projektteilnehmern Email-Benachrichtigungen schicken, wenn Projektaufwände sich dem zugeordneten Budget nähern oder dieses überschreiten. -
Developer Center
Developer Center
-
User Manual
User Manual
-
Your ideas continue to make gTrax a better product
Your ideas continue to make gTrax a better product
-
Integrate your application with gTrax, or import historical data
Integrate your application with gTrax, or import historical data
-
Reference material for using and configuring gTrax in your organization
Reference material for using and configuring gTrax in your organization
-
What is you company''s billing time increment (in minutes)? As an example, if the increment is 15 minutes then all timesheet entries will be rounded to the nearest 15 minutes, and be forced to be at least 15 minutes long.
What is you company''s billing time increment (in minutes)? As an example, if the increment is 15 minutes then all timesheet entries will be rounded to the nearest 15 minutes, and be forced to be at least 15 minutes long.
-
minutes
minutes
Description: Save Reports