gTrax/gTrax Translation
-
Export as CSV
Export as CSV
Eksporter som CSV -
Load Saved Report
Load Saved Report
Last ned lagret rapport -
Save Report
Save Report
Lagre rapport -
Include Archived
Include Archived
Inkluder arkiv -
Billable
Billable
Fakturerbar -
Flexible Budget (Time and Materials)
Flexible Budget (Time and Materials)
Fleksibelt budsjett (Tid og Materialer) -
Fixed Budget (Fixed Bid)
Fixed Budget (Fixed Bid)
Fast Budsjett (Fast tilbud) -
No Budget (Unlimited)
No Budget (Unlimited)
Intet budsjett (Ubegrenset) -
Start Timer
Start Timer
Start klokke -
Export to Google Docs
Export to Google Docs
Eksporter til Google Docs -
Description: Number of billable hours logged against a project vs. non-billable
0=htmlElement1Begin (Example: ), 1=htmlElement1End (Example: ), 2=htmlElement2Begin (Example: ), 3=htmlElement2End (Example: ){0}0{1} of those hours are billable and {2}0{3} hours are non-billable.{0}0{1} of those hours are billable and {2}0{3} hours are non-billable.
{0}0{1} av de timene er fakturerbare og {2}0{3} timer er ikke fakturerbare. -
Notifications
Notifications
Beskjeder -
Enable email notifications?
Enable email notifications?
Velge beskjed via epost? -
gTrax can send project members notification emails when a project is approaching or passes its assigned budget.
gTrax can send project members notification emails when a project is approaching or passes its assigned budget.
gTrax kan sende beskjeder til prosjektdeltakere via epost når et prosjekt nærmer seg eller har passert sitt tildelte budsjett. -
Developer Center
Developer Center
-
User Manual
User Manual
-
Your ideas continue to make gTrax a better product
Your ideas continue to make gTrax a better product
-
Integrate your application with gTrax, or import historical data
Integrate your application with gTrax, or import historical data
-
Reference material for using and configuring gTrax in your organization
Reference material for using and configuring gTrax in your organization
-
What is you company''s billing time increment (in minutes)? As an example, if the increment is 15 minutes then all timesheet entries will be rounded to the nearest 15 minutes, and be forced to be at least 15 minutes long.
What is you company''s billing time increment (in minutes)? As an example, if the increment is 15 minutes then all timesheet entries will be rounded to the nearest 15 minutes, and be forced to be at least 15 minutes long.
Description: Export report to CSV