<strong>Completed</strong> date, and the territory is assigned to the same publisher again with the following day as <strong>Checked out</strong> date.
c148c056787cf4d45be9e7eb1c251f53f50302a7
<strong>Completed</strong> date, and the territory is assigned to the same publisher again with the following day as <strong>Checked out</strong> date.
<strong>Completed</strong> date, and the territory is assigned to the same publisher again with the following day as <strong>Checked out</strong> date.
Če je področje že dodeljeno komu drugemu, se trenutni dan nastavi kot datum, ko je bilo področje <strong>Obdelano</strong>, področje pa se ponovno dodeli istemu oznanjevalcu, pri čemer se naslednji dan nastavi kot datum, ko je bilo področje <strong>Preverjeno</strong>.
c148c056787cf4d45be9e7eb1c251f53f50302a7