TheocBase/TheocBase
-
22cde33733883f1f4e8d0b1a1624bf20790e81f9
22cde33733883f1f4e8d0b1a1624bf20790e81f9
If the outline or the title of a talk has been updated: -
606100ea3ff53e7c99d21efcf149b7086bcb86c6
606100ea3ff53e7c99d21efcf149b7086bcb86c6
If the title of the talk has been changed, doubleclick the<strong>
Theme</strong>
field of the updated talk, and enter the new title. -
c3d82643164b580dd8ff90d69e7d3c9197cefba0
c3d82643164b580dd8ff90d69e7d3c9197cefba0
You find the revision date at the end of the ouline, e.g. "No. 1-E<strong>
9/15</strong>
". -
1a2d2fc049004cd58222c1e899639a110f535e73
1a2d2fc049004cd58222c1e899639a110f535e73
Add a New Talk and Replace a Discontinued Talk -
e003291780c2ee94579c37af93de596672232a51
e003291780c2ee94579c37af93de596672232a51
When a new talk is added it is possible to replace a discontinued talk automatically. -
احتیاط:
احتیاط:
Caution: -
9151d2da7ce1c67448a8de7726d38569e9a360e1
9151d2da7ce1c67448a8de7726d38569e9a360e1
Don't follow these steps if it is just an update, e.g. revised outline, changes in the title but the same theme. -
f9f9ff9be9e6b0d584b5711dd3e73bedadda53b1
f9f9ff9be9e6b0d584b5711dd3e73bedadda53b1
Click on the<img src="../images/add_24x24.png" alt="" width="20" height="20" />
button. -
9c60a95719ad8ead8bea8d9bf62bbe01ac70b684
9c60a95719ad8ead8bea8d9bf62bbe01ac70b684
Enter the number and theme of the new talk in the<strong>
Wizard</strong>
dialog and click on the<strong>
Next></strong>
button. -
1087245823bfb6682a8d086ffddf2cb8cbcd17b5
1087245823bfb6682a8d086ffddf2cb8cbcd17b5
Select the language of the outline in the<strong>
Import subjects</strong>
dialog and push the<strong>
OK</strong>
button. -
f8660f477025f9ef3f5b0653eecf6ac45cb876c7
f8660f477025f9ef3f5b0653eecf6ac45cb876c7
Click the<strong>
Save to database</strong>
button in order to save the changes. -
64cf3c065d62438ff84d283b7d8236ca39f228f0
64cf3c065d62438ff84d283b7d8236ca39f228f0
If the previous talk has not been discontinued yet, a dialog with the message to do so will appear. Hit the<strong>
OK</strong>
button to discontinue the previous talk and add the new one. -
ee39b060d3d1c5f735dc255415d8dea58ce50ce2
ee39b060d3d1c5f735dc255415d8dea58ce50ce2
Doubleclick the<strong>
Revision</strong>
field of the new talk in the<strong>
Public Talks</strong>
list and enter the date of the update. -
0c65eceaa2395426d4b08915fe45068af9fd70b9
0c65eceaa2395426d4b08915fe45068af9fd70b9
Remove a Discontinued Talk -
f42b4413c3aaf96831d74b99bb2cea525446e2be
f42b4413c3aaf96831d74b99bb2cea525446e2be
Open the<strong>
Add talks</strong>
page in the<strong>
Public Talks Settings</strong>
. -
f6450dd8aabc036a2bfec26499fecb37706682d8
f6450dd8aabc036a2bfec26499fecb37706682d8
Uncheck the<strong>
Hide discontinued</strong>
check box in order to enable editing of discontinued talks. Now the columns<strong>
Released on</strong>
and<strong>
Discontinued on</strong>
are visible as well. -
97145483f137d8ed5f69d293be61ce6a632e989c
97145483f137d8ed5f69d293be61ce6a632e989c
Doubleclick the<strong>
Discontinued on</strong>
field and enter the date of the removal. -
60c221198d8d616125ec17453cd9711a40322909
60c221198d8d616125ec17453cd9711a40322909
If a speaker with this talk is scheduled, a message appears, that scheduled talks with this outline will be moved to the<strong>
To Do List</strong>
. Click the<strong>
OK</strong>
button. -
e48f5040d150b6726143d0dc618991e956fab25e
e48f5040d150b6726143d0dc618991e956fab25e
Doubleclick the<strong>
Revision</strong>
field and enter the date of the update. -
087ab590b358e0dfe3d49f44704ad7692d8e133b
087ab590b358e0dfe3d49f44704ad7692d8e133b
Enter the public talks according to the instructions in the dialog.