TheocBase/TheocBase
-
fb33069c9c48a771f255a4756d37aa1da9aafcae
fb33069c9c48a771f255a4756d37aa1da9aafcae
Press the<strong>
Next</strong>
button and choose a language. -
3e35c3f36098def88cb5e6ed0c8e35619f5ce1b2
3e35c3f36098def88cb5e6ed0c8e35619f5ce1b2
Press the<strong>
OK</strong>
button and review what you have pasted. -
18e975e9045575bf78a6a87411e95585dcef3615
18e975e9045575bf78a6a87411e95585dcef3615
When satisfied with the talk list, press the<strong>
Save to Database</strong>
button. -
更新的演讲大纲
更新的演讲大纲
Revised Public Talk Outlines -
4551854c769195c0b58bc994c7f8a2c8f8f5b97d
4551854c769195c0b58bc994c7f8a2c8f8f5b97d
In order to keep track of changing titles, outlines or complete replacements of talks it is possible to set the corresponding dates of their releasing and discontinuing as well as their current revision date. When a discontinued talk is replaced by another, it is neccessary to set the discontinued date [1] of the old talk and the release date [2] of the new talk, because these dates determine which of these talks should be displayed at a given time: -
更新的演讲大纲
更新的演讲大纲
Revised talk outlines -
更新演讲
更新演讲
Update a Talk -
如果演讲的大纲或题目已经更新了
如果演讲的大纲或题目已经更新了
If the outline or the title of a talk has been updated: -
606100ea3ff53e7c99d21efcf149b7086bcb86c6
606100ea3ff53e7c99d21efcf149b7086bcb86c6
If the title of the talk has been changed, doubleclick the<strong>
Theme</strong>
field of the updated talk, and enter the new title. -
c3d82643164b580dd8ff90d69e7d3c9197cefba0
c3d82643164b580dd8ff90d69e7d3c9197cefba0
You find the revision date at the end of the ouline, e.g. "No. 1-E<strong>
9/15</strong>
". -
1a2d2fc049004cd58222c1e899639a110f535e73
1a2d2fc049004cd58222c1e899639a110f535e73
Add a New Talk and Replace a Discontinued Talk -
e003291780c2ee94579c37af93de596672232a51
e003291780c2ee94579c37af93de596672232a51
When a new talk is added it is possible to replace a discontinued talk automatically. -
注意:
注意:
Caution: -
9151d2da7ce1c67448a8de7726d38569e9a360e1
9151d2da7ce1c67448a8de7726d38569e9a360e1
Don't follow these steps if it is just an update, e.g. revised outline, changes in the title but the same theme. -
f9f9ff9be9e6b0d584b5711dd3e73bedadda53b1
f9f9ff9be9e6b0d584b5711dd3e73bedadda53b1
Click on the<img src="../images/add_24x24.png" alt="" width="20" height="20" />
button. -
9c60a95719ad8ead8bea8d9bf62bbe01ac70b684
9c60a95719ad8ead8bea8d9bf62bbe01ac70b684
Enter the number and theme of the new talk in the<strong>
Wizard</strong>
dialog and click on the<strong>
Next></strong>
button. -
1087245823bfb6682a8d086ffddf2cb8cbcd17b5
1087245823bfb6682a8d086ffddf2cb8cbcd17b5
Select the language of the outline in the<strong>
Import subjects</strong>
dialog and push the<strong>
OK</strong>
button. -
f8660f477025f9ef3f5b0653eecf6ac45cb876c7
f8660f477025f9ef3f5b0653eecf6ac45cb876c7
Click the<strong>
Save to database</strong>
button in order to save the changes. -
64cf3c065d62438ff84d283b7d8236ca39f228f0
64cf3c065d62438ff84d283b7d8236ca39f228f0
If the previous talk has not been discontinued yet, a dialog with the message to do so will appear. Hit the<strong>
OK</strong>
button to discontinue the previous talk and add the new one. -
ee39b060d3d1c5f735dc255415d8dea58ce50ce2
ee39b060d3d1c5f735dc255415d8dea58ce50ce2
Doubleclick the<strong>
Revision</strong>
field of the new talk in the<strong>
Public Talks</strong>
list and enter the date of the update.
Il n’a plus de segments à afficher.
Chargement d’autres segments en cours…
© 2009-2024 WebTranslateIt Software S.L. Tous droits réservés.
Termes d’utilisation
·
Politique de confidentialité
·
Politique de sécurité