TheocBase/TheocBase
-
Cancellation
Cancellation
Peruutus -
Current Circuit Overseer
Current Circuit Overseer
Nykyinen kierrosvalvoja -
Not set
Not set
Ei asetettu -
PT
PT
E -
Ch
Ch
Pj -
WT-R
WT-R
WT-L -
Subject
Subject
Aihe -
Open directory
Open directory
Avaa hakemisto -
Import Error
Import Error
Tuontivirhe -
Could not import from Ta1ks. Files are missing:
Could not import from Ta1ks. Files are missing:
Ei voida tuoda Ta1ks:stä. Tiedostoja puuttuu: -
♢1
♢1
♢1 -
♢2
♢2
♢2 -
♢3
♢3
♢3 -
BS-R
BS-R
RT-L -
Publishers
Publishers
Julistajat -
Midweek Meeting
Midweek Meeting
Kokous viikolla -
Number of weeks after selected date
Number of weeks after selected date
Viikot valitun päivän jälkeen -
Number of weeks to gray after an assignment
Number of weeks to gray after an assignment
Viikot harmaana tehtävän jälkeen -
Number of weeks before selected date
Number of weeks before selected date
Viikot ennen valittua päivää -
%1 is scheduled for public talks! These talks will be moved to the To Do List if you remove him as speaker. Remove him as speaker?
%1 is scheduled for public talks! These talks will
be moved to the To Do List if you remove him as speaker.
Remove him as speaker?%1:lle on määrätty esitelmiä. Nämä puheet
tullaan siirtämään tehtävälistaan jos poistat hänet puhujista.
Poistetaanko puhujista?
Il n’a plus de segments à afficher.
Chargement d’autres segments en cours…
© 2009-2024 WebTranslateIt Software S.L. Tous droits réservés.
Termes d’utilisation
·
Politique de confidentialité
·
Politique de sécurité