🔁


Historique

  1. If the territory is already assigned to someone, the current day is set as <strong>Completed</strong> date, and the territory is assigned to the same publisher again with the following day as <strong>Checked out</strong> date.
    If the territory is already assigned to someone, the current day is set as <strong>Completed</strong> date, and the territory is assigned to the same publisher again with the following day as <strong>Checked out</strong> date.

    If the territory is already assigned to someone, the current day is set as <strong>Completed</strong> date, and the territory is assigned to the same publisher again with the following day as <strong>Checked out</strong> date.

    modifié via l’API .
    Copier dans le presse-papier
  2. Če je področje že dodeljeno komu drugemu, se trenutni dan nastavi kot datum, ko je bilo področje <strong>Obdelano</strong>, področje pa se ponovno dodeli istemu oznanjevalcu, pri čemer se naslednji dan nastavi kot datum, ko je bilo področje <strong>Preverjeno</strong>.
    Če je področje že dodeljeno komu  drugemu, se trenutni dan nastavi kot datum, ko je bilo področje <strong>Obdelano</strong>, področje pa se ponovno dodeli istemu oznanjevalcu, pri čemer se naslednji dan nastavi kot datum, ko je  bilo področje <strong>Preverjeno</strong>.
    modifié par Boštjan .
    Copier dans le presse-papier
  3.  
    modifié par Boštjan .
    Copier dans le presse-papier