🔁


Historique

  1. When dates for the assignments are entered, a validation takes place to check for instance if date ranges of different assignments overlap. Invalid date ranges are marked with a red box. If the input cannot be recognized as a valid date, the text color is red and cannot be saved.
    When dates for the assignments are entered, a validation takes place to check for instance if date ranges of different assignments overlap. Invalid date ranges are marked with a red box. If the input cannot be recognized as a valid date, the text color is red and cannot be saved.
    modifié via l’API .
    Copier dans le presse-papier